Projects

Chikobava street

Time: September 2021
Performed works:

Red zebra crossings, directional arrows, double lines and other

Methods of performance:

Flat road marking

Materials used:

Cold and thermoplastic

Kutateli Street

Time: August 2021
Performed works:

Golden zebra crossings

Methods of performance:

Flat road marking

Materials used:

White and yellow cold plastic

Libani street

Time: August 2021
Performed works:

Directional arrows, double lines

Materials used:

Yellow and white cold plastic

Saakadze Square, Shartava and Kostava streets

Time: 2018
Performed works:

Lines for vehicles, two-lane pedestrian crossings and other road markings

Materials used:

Cold and thermoplastic

M2 Tbilisi

Time: 2019
Performed works:

Installation of video surveillance systems